The CNIM different intervention types

Design, Construction and Operation

Today CNIM operates two waste-treatment plants in France: the Chevreuse plant (2 x 6 t/h of household waste) and the Thiverval-Grignon-Plaisir plant (2 x 8 t/h + 1 x 14.7 t/h of household waste). Operation of these plants is based on renewable contracts.

Design, Construction, Operation and Waste-to-Energy Conversion

In this case, CNIM guarantees the waste-to-energy processing of the plant it built and operates.
An example of this is the Toulon waste-treatment plant (capacity 2 x 12 t/h et 1 x 15 t/h of household waste) which sells steam and electricity to the utility grids (majority stake hold in CCUAT).

Pictures :



Design


Construction


Commissioning/operation

Back to Environment and services : Waste treatment
Français | Site map | Contact | Legal notice